[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

DAM-L tehri - india - resettlement - sandrp report



----- Forwarded message from owner-dam-l@sandelman.ottawa.on.ca -----

Return-path: <owner-dam-l@sandelman.ottawa.on.ca>
Received: from [[UNIX: localhost]] ([[UNIX: localhost]])
	by lox.sandelman.ottawa.on.ca (8.8.7/8.8.8) id BAA27016;
	Fri, 23 Nov 2001 01:26:11 -0500 (EST)
Date: Fri, 23 Nov 2001 01:26:11 -0500 (EST)
From: owner-dam-l@sandelman.ottawa.on.ca
Message-ID: <200111230626.BAA27016@lox.sandelman.ottawa.on.ca>
To: owner-dam-l@sandelman.ottawa.on.ca
Subject: BOUNCE dam-l@sandelman.ottawa.on.ca: Approval required:    Non-member submission from [SANDRP <cwaterp@vsnl.com>]   

>From owner-dam-l@lox.sandelman.ottawa.on.ca  Fri Nov 23 01:26:08 2001
Received: from ndc.vsnl.net.in (del3.vsnl.net.in [202.54.96.3])
	by lox.sandelman.ottawa.on.ca (8.8.7/8.8.8) with ESMTP id BAA27011
	for <dam-l@sandelman.ottawa.on.ca>; Fri, 23 Nov 2001 01:26:06 -0500 (EST)
Received: from vsnl.com (unknown [203.197.224.151])
	by ndc.vsnl.net.in (Postfix) with ESMTP
	id 08A6B2416F; Fri, 23 Nov 2001 06:23:45 +0000 (IST)
Message-ID: <3BFDEBC2.E060C92F@vsnl.com>
Date: Fri, 23 Nov 2001 11:55:06 +0530
From: SANDRP <cwaterp@vsnl.com>
Organization: SANDRP
X-Mailer: Mozilla 4.75 [en] (Win98; U)
X-Accept-Language: en
MIME-Version: 1.0
Subject: PRESS RELEASE: New Report on Tehri Dam Resettlement
Content-Type: text/plain; charset=iso-8859-1
Content-Transfer-Encoding: 8bit
To: undisclosed-recipients:;

Press Release              November 23 2001

SANDRP REPORT ON FAILURE OF TEHRI RESETTLEMETNT

FIELD SURVEY SHOWS UTTER VIOLATION OF ALL R&R NORMS
FAILURE TO PROVIDE LAND
ABSENCE OF PROPER INSTITUTIONAL MECHANISM TO ASSURE R&R
ABUSE OF HUMAN RIGHTS

A new report on the Resettlement and Rehabilitation (R&R) aspects of the
under construction Tehri dam have found that the project implementation
is violating all the R&R norms, the project authorities are unable to
provide land as stipulated in the accepted policies (which is in any
case inadequate for acceptable resettlement), there is absence of proper
mechanisms and norms to assure successful resettlement. For the past 30
years the affected people’s most basic demand has been no land, no dam.
The report Testimonies from the Ground: A report on Tehri Rehabiliation
by Preeti Sampat and Vimalbhai being released today by SANDRP, based on
field surveys, interviews with project authorities and affected people,
have recommended that if a social disaster is to be avoided, all
construction on Tehri Dam must cease, until the fundamental conditions
necessary for success of Resettlement are met.

The Project Tehri Project, one of the largest and most controversial
large dams in India, consisting of Tehri and Koteshwar dam, is under
construction in the Ganga River basin for almost 25 years in the
Northern Himalayan state of Uttaranchal. The project will adversely
affect over 100 000 people. The experience with resettlement in India
has been dismal. According to a number of studies, including the WCD
(World Commission on Dams) India Country Study, at least 75% of some 40
million people displaced for large dams in India over the past five
decades have never been resettled.

The experience of the World Bank and other institutions, as also
reflected in the report of the WCD, shows that for resettlement to
succeed, certain basic requirements have to be met: Existence of a
comprehensive and accurate information base regarding the number of
people affected, their income structure, livelihoods and resource
utilization. A comprehensive policy taking into account all aspects of
displacement and all categories of displaced. The availability of land
in suitable quality and area to resettle village communities as intact
social entities. Full participation of project affected people in
planning, design and implementation of a transparent and accountable
resettlement process. Detailed resettlement plan, budget and timelines,
with a clearly defined linkage between construction, submergence,
displacement and resettlement, and an independent monitoring system are
some of the minimum conditions necessary to achieve just R&R.

In the case of Tehri none of these requirements are met. Even 25 years
after project construction began, no accurate data on the number of
people affected is available no credible R&R plan exists. The EIA for
the project from 1990 estimates 97,000 people to be displaced by the
project, but current data of Tehri Hydro Development Corporation adds up
to only about 67,500. Large numbers of affected people are obviously not
even included in the R&R package. No socio-economic base studies were
done. Land is available for only a minority of PAPs (Project Affected
Persons) and that land is of questionable quality or already belongs to
other communities. No information, participation or accountability
mechanisms exist. To top things off corruption and nepotism are rampant
in the entire R&R process.

PROGRESS OF RURAL R&R SO FAR:
§ Over 70% of the rural families are yet to receive basic allotment of
Resettlement benefits.
§ Over 90% of those who are called “Partially Affected Families” are yet
to be given resettlement benefits.
§ Over 57% of fully affected families are yet to be given land, the
basic minimum resettlement facility. Also, the figures above do not
include many other affected people.
§ Over 93% of Ex-gratia is yet to be paid.

NO PROGRESS IN LAND FOR R&R SINCE 1997 One of the most shocking aspects
of R & R process is that if one looks at closely, in FOUR YEARS between
March 1997 and March 2001, the project authorities have achieved
practically no progress in acquiring land for resettlement of the
affected people. According to the report of the Hanumantha Rao
Committee, appointed by the Govt. of India to review the R&R aspects of
Tehri Project, by March 1997, “the state government had acquired 4100
acres in 16 clusters for the resettlement of the affected families” from
rural areas. According to Govt. of Uttaranchal’s R&R report of March
2001, the state government had in its possession 1622 plots of 2 acres
each and 666 plots of 0.5 acres each at 16 rural clusters. That amounts
to 3577 acres. The March 2001 report has no further claims to
availability of land for R&R. That means that in four years between
March 1997 and March 2001, the state government has been unable to
acquire any new land for resettlement of rural families. This not only
shows incompetence of the government in R&R, it in fact shows utter
callousness on the part of state government towards the affected people.

PROGRESS OF URBAN R&R Even as the project authorities repeatedly
threaten to submerge Tehri town and break off minimum facilities
available for the people, they have been able to achieve:
§ no more than 20% of resettlement in bare minimum terms,
§ Over 53% of entitled plot holders are yet to shift.
§ Over 46% flat holders are yet to shift.
§ Almost 90% of house construction assistance is yet to be given.

The ‘progress’ shown above has been achieved after over 25 years of
project implementation. It only indicates how many more years it would
take to complete the R&R task.

The people displaced by the Tehri project seem to have a bleak future --
worse off than they were before the project; pauperized in the name of
development. This dam seems no different from previous precedents of
large dams, the R&R failures of which are acknowledged even by the Govt.
of India.

In summary, it is entirely clear that the bulk of PAPs will be displaced
without resettlement, that R&R in the project is a shambles and that
Tehri will lead to the destitution and pauperization of probably more
than 100,000 people. In this sense, the Tehri project would be a
monument of destruction and not development. The project violates the
conditions laid out in the GoI's environmental clearance, the provisions
of India's draft resettlement policy and most of the basic
recommendations of the WCD report. For the past 30 years the villagers’
most basic demand has been no land, no dam. If a social disaster is to
be avoided, all construction on Tehri Dam must cease, until this demand
and the fundamental conditions necessary for success of Resettlement
mentioned above are met.

For SANDRP

PS: Vimalji, one of the authors of the report, would be available at Ph:
22 18780, on Nov. 23, 2001 to answer any questions you may have on the
report and the project.

HARD COPIES OF THE REPORT AVAILABLE WITH SANDRP.
FULL REPORT IN WORD ALSO AVAILABLE WITH SANDRP.